What happened on real sites

Stories from the portfolio: what the company does, what stage it is at and what of it is verified. Figures here are either our own data or public sources. What we could not verify, we do not quote, however good it sounds.

Prengi × Ukrposhta

Energy monitoring across a postal network: from pilot to a scaling decision

A network of branches across the country, each with its own equipment, working hours and electricity bill. As long as readings are collected by hand, overconsumption is visible after the fact and a breakdown is visible once it has happened.

Prengi, a winner of the third Climate Innovation Vouchers wave, builds a property management platform: it collects equipment data, brings it into one interface and flags deviations, so the equipment effectively reports its own maintenance needs.

What we did: Prengi received the CIV grant, wave 3; Greencubator introduced the company to Ukrposhta and ran the first meeting; the pilot went live on a group of branches with measurements before and after; Ukrposhta is now extending the monitoring to new branches, which is an open challenge in our catalogue.

What this case does not contain: Ukrposhta has not published network savings figures, and we do not invent them. What is verified here is different, that the matching worked, that the pilot ran on real sites, and that the company now decides on scale using its own data.

What is verified

Хвиля 3
Climate Innovation Vouchers grant
Пілот
a group of branches, measured before and after
У роботі
expansion to new branches
Prengi × Ukrposhta
Energy monitoring across a postal network: from pilot to a scaling decision
Ukrposhta runs one of the largest building networks in the country. Prengi deployed a platform that reads data from equipment and shows overconsumption and early signs of failure. The pilot ran on a group of branches; the network decision follows. Greencubator arranged the introduction.

Companies from the CIV portfolio

Each one went through the competition and delivered a grant project. Stages differ, from serial production to development, and we say which is which.

Go To-U

From a CIV grant to a platform backed by ABB and Siemens

180 000+
stations across North America via roaming, per the company, 30.07.2026
ABB, Siemens
investors after the CIV grant

Go To-U built an operating system for EV charging networks: access, tariffs, metering, payments. For a site owner that turns a parking lot into revenue and into an argument in the conversation with tenants. The company grew from a CIV grant to an investment round with ABB and Siemens, and connects other operators through roaming: in July 2026 it announced access to more than 180,000 stations across North America.

Prana Platinum

Recuperators with copper heat exchangers, made in Ukraine

Україна
own manufacturing, not rebadged imports

Prana builds decentralised recuperators with copper heat exchangers: the unit returns the heat of outgoing air back into the room, so the boiler burns less gas to hold the same indoor temperature. The company scaled from a CIV grant to serial production in Ukraine and exports.

The Good Plastic Company

Interior panels made from recycled polymers

CIV
the grant the recycling started from

The Good Plastic Company turns polymer waste into large-format panels for interiors and furniture: waste you pay to remove becomes a material somebody buys. The company says its panels have been used in Nike and Adidas retail interiors; we have not verified that with the brands.

E Farm Pro

Autopilots for precision farming, the same technology for demining

Агро + демайнінг
dual use

E Farm Pro builds GPS navigation and autopilots that hold a machine on track within a few centimetres: fewer overlaps, fewer passes, less fuel and fertiliser per hectare. The company is adapting the same guidance stack for field demining.

R.FLO

Iron-based flow batteries, no critical raw materials

20 год
design storage duration

R.FLO is developing iron-based flow batteries: no critical raw materials, with a design storage duration of up to 20 hours. For a site that means a night reserve rather than a few peak hours. The company is at development stage, this is not yet a serial product.

Start with the task, not the technology

Name what costs you too much or keeps breaking, and we will come back with three to five companies that have already closed it for someone.